Guide · For property owners

Reading a roofing proposal

Line by line, what each item means and which omissions cost you later.

Published Reviewed United States RCA staff 3 min read

Two proposals for the same roof can differ by thousands of dollars and still both be honest. The difference is usually scope. This is how to read one.

The parties

The proposal should name the legal business entity, not just a brand, with a physical address and a phone number. Your name and the property address should be right. If the business name here differs from the one on the insurance certificate, stop and ask why.

Tear-off or layover

Tear-off means removing the existing roof down to the deck. Layover means installing new shingles over the old ones.

Layover is cheaper, permitted in some jurisdictions and not others, limits your warranty options, hides deck problems, and makes the next replacement more expensive. Most of the time, tear-off is the right answer. What matters is that the proposal says which one you are buying.

The proposal should also state how many existing layers they expect to remove. "Remove one layer" with no price for a second layer is a surprise waiting to happen.

The deck

Under the shingles is sheathing, and some of it may be rotten. Nobody can know how much until the old roof is off.

A good proposal handles this with a stated unit price: a per-sheet or per-square-foot rate for replacement decking, and a commitment to tell you before doing it. A proposal silent on decking is the most common source of the bill being larger than the quote.

Underlayment and water protection

  • Underlayment: synthetic or felt, and what weight. Synthetic is standard now.
  • Ice and water shield: a self-adhering membrane at eaves, valleys and penetrations. In cold climates this is where ice dams are won or lost.
  • Valleys: how they are built, and with what.

Flashing, edges and penetrations

This is where roofs actually leak, far more often than in the field of the shingles. The proposal should say whether flashing is being replaced or reused at: chimneys, walls, skylights, plumbing vents, and the roof-to- wall junctions.

"Reuse existing flashing" is sometimes reasonable and sometimes how you get a leak in a brand new roof. Ask which items are being replaced and why.

Also look for drip edge at eaves and rakes, and new pipe boots. Reusing cracked rubber pipe boots under a new roof is a false economy that shows up in three years.

Ventilation

Intake at the soffits and exhaust at or near the ridge. Insufficient ventilation shortens shingle life and can void a manufacturer's warranty.

If the proposal adds ridge vent, check that it also addresses intake. Ridge vent with blocked soffits does very little.

The actual materials

Manufacturer, product line, colour, and the nailing pattern or a reference to the manufacturer's installation instructions. "Architectural shingles" is not a product.

Warranty, which is two warranties

  • The manufacturer's material warranty covers defective shingles. It is often long, usually prorated, and frequently conditional on correct installation and ventilation.
  • The contractor's workmanship warranty covers installation. This is the one that matters in the first years, and the one that is worthless if the business disappears.

Get both in writing with their terms, and get the workmanship warranty's term stated in years.

Money and schedule

  • Total price, and what is excluded.
  • The payment schedule, with amounts and triggers.
  • Who pulls the permit and who pays for it.
  • An approximate start and duration, with the sensible caveat about weather.
  • The change-order process: work stops, you are told, you get a price, you approve before it happens.

Cleanup and protection

Debris removal, dumpster placement, magnetic sweeping for nails, and protection for landscaping, air-conditioning units and driveways. Worth having in writing, because "we will clean up" and a yard full of nails is a dispute we see regularly.

What to do with two very different numbers

Put them side by side and mark where the scope differs. Nine times out of ten the cheaper bid is cheaper because it does less: layover instead of tear-off, reused flashing, no new pipe boots, no ventilation work, or no stated decking allowance.

That may be a perfectly reasonable choice for your situation. Just make it knowingly.

General guidance, not advice about your situation. Roofing requirements, contract rules and consumer protections differ by state and by city. For a specific dispute or contract question, talk to your local building department, your state consumer protection office, or a lawyer.

Find a contractor

Search the directory and see what the association has reviewed on each listing.

Search the directory

Check before you hire

We can confirm insurance, registration and complaint history on any roofing contractor.

Order a check